We look forward to updating the site weekly with new guides and layouts. We’re very proud to have launched this website and hope you have found the guide both helpful and enjoyable. With that done you’ve completed this layout, do note that you can use the resin for other options rather than just sinking it but we’ll be talking about resin at a later date. Finally, place stackable conveyor poles above the centre pipeline and connect the resin merging line to the awesome sink. Now grab the awesome sink and place it three places away from the merger, you should now be able to hook an elevator to the awesome sink. Our final job is to place an awesome sink opposite the last generator, to get the same placement as me you will want to place a merger stacked three high above the pipeline in front of the last generator. With the generators, all in place, select one generator and underclock it to 33% at this point all your generators should be hooked up to the pipeline. Next place pipeline joints in front of the inputs and run the pipeline from the refinery section all the way through to the last generator. Opposite this line and inline, we will place a further six fuel generators running along the front of the fourth column. Next, we need to place the last generators, against the top three generators, place five more generators along the same line. You can then delete the two mergers beneath the line. The mergers should be flowing to the left, ensure that this is merging line is using a MK3 conveyor as at full capacity we will be running 150 resin along the line. Connect the generators and the refineries to the pipeline joints, note that you will need a separate pipeline joint in front of the second, fourth, and fifth refinery then connect these pipelines together.Ībove this pipeline, place a merging line in the centre of the fourth column in front of the refineries, these should be stacked three high and connected with elevators so that we can lift the resin above the pipelines. Next, you will want to place pipeline joints in front of the generators in the middle of the fourth row. We shall now place our first three fuel generators, they should have their inputs in front of the refineries and should be placed starting against the last edge of the grid along the top of the fourth row. You will now connect the crude oil pipeline to these pipe joints and the refineries. Once you've placed the five refineries, place pipe joints in front of each of the refinery intakes. In order to get the correct placement, place the first refinery flush against the edge of the last column, and ensure that there is enough room for a pipe joint in front of the refinery. We shall place these against the bottom right of the grid, starting from the 23rd column. This guide will have screenshots along with a link to the associated video.įirst, we shall place the five refineries along the 23 x 7 Grid. This layout aims to produce fuel from crude oil efficiently, following the super-efficient build guide series. Current H2S Alive, TDG and First Aid certification are also an asset.Crude Oil to Fuel Super-Efficient Build Guide.Must possess and maintain a valid class 5 driver’s license (Class 3 would be a definite asset).Related pipeline field operations experience.Preference will be given to candidates with a related trade certification.Participate in the district on-call rotation as assigned.Ensure Inter Pipeline’s pigging practices and schedules are followed.Execute assigned projects to plan (budget, quality and schedule). Participate in facility audits and inspections.Accountable for monthly measurement (meter proving, month-end reporting). Responsible for weekly and monthly compliance checks of pump station sites and mainline block valves.Ensure compliance with all regulatory standards, policies and procedures.Conduct regular site visits to maintain assets in a safe, reliable operating condition, and maintain good housekeeping.Perform operational tasks such as equipment integrity checks, product quality control verification and measurement accuracy with month-end cutoff and custody transfer ticketing.Responsible for the safe, accurate and efficient movement of petroleum products within the crude oil and condensate pipeline systems.Located out of our Sherwood Park office, the individual in the Field Operator role will report to the Senior Operations Technician and the Supervisor, Pipeline Field Operations for the Boreal/Cold Lake/Corridor/Polaris Pipeline systems.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |